Friday
I pulled in at 3:00 pm with a truck bed full of tools and Outhouse 2.0 on the ATV trailer. This weekend will be the final project push before Puckaweekend 2016. It’s overcast and in the mid-60s and the forecast is calling for intermittent rain all weekend. Not sure how much yard work I’ll be able to get done, but there are plenty of other things to do. I unhooked the trailer and backed up to the pole barn to start unloading tools and materials. I’ll be leaving most of this stuff up here until next weekend. I was just about done when I noticed someone with a day-glo yellow shirt walking up the drive. It was a dump truck driver with Kinas Excavating and he had a full load of gravel to spread at the end of the driveway. Perfect timing. I walked him down and showed him where we wanted it, though the low spots were pretty obvious. Once he knew where to drop, it didn’t take him long to get to work. He had it all spread evenly and was on his way within minutes. It was pretty impressive to watch.
After taking a minute to check out the new driveway, I grabbed the green ATV, hooked it up to the small yard trailer, and backed up to the outhouse. I took down the Christmas lights and removed everything of value from the outhouse like the seat and roll holder. I then took a sledge to the roof assembly, hoping I could pop it loose to re-use on the new outhouse. No such luck. The old roof came away in pieces and shingles crumbled right off of it. I’ll have to come up with a different plan for Outhouse 2.0.