Month: September 2016

Log: September 17, 2016

Lyssa, the boys, and I pulled in at 11:00 after breakfast at Aunt Judy’s. Heading down the driveway, I was nervous that the new paint on the keep might not have held up through the big storms that rolled through this past week, but the place looks absolutely great. On our way up, we had stopped at J&A for a deer block. They were out of stock and won’t have more until Tuesday, so I got a bag of molasses-based feed and two bags of shell corn instead. I unloaded the boys’ power wheels from the back of the truck and they were off to the races. I carried the goods from J&A to the garden shed and got a bummer of a surprise upon opening it up. I had left a full 50-lb bag of sunflower seed in there without sealing it in one of the containers and the chipmunks had completely looted it. So much for filling the bird feeders. I spread the remains of the bag, the molasses mix, and some shell corn in the area behind the feeders and made sure the rest of my new purchases were secured in critter-proof cans. Chipmunks suck.

img_20160917_141858748

Musty paneling sure gets hot in a hurry.

I’ve got two goals today: collect building materials to build a new outhouse, and clean up fallen branches and brush around the yard. I knew there was a good-sized stack of exterior pine board paneling under the big house trailer, so I grabbed the green ATV and small yard trailer and started digging things out. Roughly 60% of the sheets were too rotten or rough to be of any use, so I stacked them on the trailer to get burned. The rest I set aside to get picked up later. The pit was already stacked with the big oak limb I cut down last trip, so I made a teepee out of the panels over that, poured on some old boat gas, and lit ‘er up. Wasn’t long before I had a nice hot fire. Lyssa tended it while I took the boys into town for snacks and to fill the two big gas cans from the pole barn with ethanol-free fuel. I stopped in at J&A again to see if they had any sunflower seed to replace the bag the chipmunks binged on. This, too, was out of stock until Tuesday. It’s always Tuesday.

Continue reading

Log: September 3 – 5, 2016

Saturday

I pulled in at 11:30 with a truck full of tools, painting supplies, and a big ol’ 36″ prehung, outswing, exterior door I found for cheap on craigslist. It’ll eventually adorn the new outhouse, but for now it goes in the pole barn. Unloaded the rest of the tools and drove over to the keep where I hauled in my clothes, some clean towels and sheets, two flats of bottled water, and a cooler full of my latest batch of pickled goods. They now bide their time in the keep fridge, awaiting the brave souls who shall attend Puckaweekend 2016.

img_20160822_222326881

From left to right: garlic mushrooms, mustard/Tabasco eggs, horseradish eggs, pickles, Hell pickles, spicy garlic asparagus, Inferno asparagus.

With the truck emptied out and the pole barn jukebox playing some 70’s rock, it was time to set my sights on the big project of the weekend: painting the keep. I finally have a stretch of days with weather that lends itself well to painting outdoors (it’s supposed to stay under 80° with low humidity and plenty of sun all weekend), and I’m planning on making the most of it.

However, before I could even crack open a can of paint, I needed to prep the keep. I filled the bird feeders, then hauled the ladder onto the deck and used it to get a good look at the roof. What a mess. Years of leaves and small branches have piled up, decomposing into dirt in spots, the edging is pulling away in several places, the main vent pipe for the furnace is not connected to anything, and there’s grime and moss everywhere. I brought a leaf blower up and blasted the majority of the compost away, then took some sheet metal screws and secured the trim and the vent. Now it was time for the heavy equipment.

Continue reading

© 2018 Puckaway Motor Club

Theme by Anders NorenUp ↑